2024 Road & Bridge Construction Program
Overview
Project Summary
- 90 total projects including road reconstruction, bridge reconstruction, road resurfacing, traffic safety improvements, intersection improvements and preventative maintenance.
- 11 bridge replacements
- 32 miles of pavement resurfacing projects, such as reclaim overlay, mill overlay and overlays.
- 111 miles of preventative maintenance projects such as chip sealing and scrub sealing.
- 6.5 miles of full urban and rural road reconstruction.
- 16 miles of GRIP projects (Gravel Road Investment Program).
- Add additional gravel road surfacing, grading and surface stabilization.
- Safety improvement projects:
- High Friction Surface Treatments (HFST) on various county highway curves.
- Construct turn lanes on TH 37 at both intersections with CSAH 5 (MnDOT led).
- Construct J-Turn at intersection of TH 61 and CSAH 42 (Homestead Rd.) (MnDOT led).
- Construct turn lanes on US 2 at the intersection with CR 223 (Munger Shaw Rd.). (St. Louis County led).