The St. Louis County Public Works Department has a proposed a bridge replacement project on CR 382 (Woodland Rd) located 5.0 miles south of Eveleth and spanning over the Long Lake Creek. The replacement work is scheduled for construction between July 27 and September 26, 2026, but is anticipated to only need 4-weeks upon start. The scope of the project is to remove the existing culverts, construct a single 16-foot precast concrete box culvert, and approximately 450-feet of road work.
Location
1.2 Mi S of TH-37 and 0.05 Mi W of CR 329 (Peary Rd)

Traffic Impacts
Road will be closed with no detour required.