About this Project
The St. Louis County Public Works Department has a proposed a slide repair project on CSAH 108 (Lost Lake Rd), adjacent to St. Louis River, and located 6.9 miles SW of Gilbert. The slide repair work is scheduled for construction between July and August 2026 and will be completed by County Maintenance forces. The scope of the project is to repair sloughing and erosion along 300-feet of CSAH 108 road shoulder.
Location
1.4 Mi N of CSAH 95 (Bodas Rd) and 0.5 Mi S of UT 9211 (Barker Rd E)
Traffic Impacts
Traveling south from the project, take a right turn onto CSAH 95 (Bodas Rd) for 1.0 miles. Take the next right onto UT 9212 (Barker Rd S), and another right onto UT 9211 (Barker Rd E) to connect back onto CSAH 108 (Lost Lake Rd).
About this Project
The St. Louis County Public Works Department has a proposed a slide repair project on CSAH 108 (Lost Lake Rd), adjacent to St. Louis River, and located 6.9 miles SW of Gilbert. The slide repair work is scheduled for construction between July and August 2026 and will be completed by County Maintenance forces. The scope of the project is to repair sloughing and erosion along 300-feet of CSAH 108 road shoulder.
Location
1.4 Mi N of CSAH 95 (Bodas Rd) and 0.5 Mi S of UT 9211 (Barker Rd E)
Traffic Impacts
Traveling south from the project, take a right turn onto CSAH 95 (Bodas Rd) for 1.0 miles. Take the next right onto UT 9212 (Barker Rd S), and another right onto UT 9211 (Barker Rd E) to connect back onto CSAH 108 (Lost Lake Rd).
Page published: 03 May 2026, 05:02 PM
Anticipated Timeline
Project Start Date: July 2026
Lost Lake Rd (CSAH 108) - Slide Repair is currently at this stage
Project End Date: August 2026
this is an upcoming stage for Lost Lake Rd (CSAH 108) - Slide Repair
Construction will occur from May through October in 2023 and 2024. In 2023, construction will occur between Haines Road and Hutchinson Road. In 2024, construction will occur between Hutchinson Road and Piedmont Avenue. Construction will be occurring between 7:00 am and 7:00 pm Monday through Friday, and between 7:00 am and 5:00 pm on Saturdays. No work will occur on Sundays.
How will I get to my house if I live on this section of roadway?
Houses with no access to a side street will access their homes either by driving through the construction site, or walking on a marked path to their home when road access is not feasible. We will try and keep the amount of time that walking is required to a minimum. Persons with disabilities should contact Steve Krasaway to discuss special accommodations.
Who do I contact if I would like additional work performed on my driveway, yard, or sidewalk?
Please contact the Contractor directly for any additional work you would like performed on your driveway, yard, or sidewalk.
How will I know when there will be a disruption in access to my property?
The Contractor will contact you prior to any disruptions to access to your property to discuss the details on where to park.