About this Project
The St. Louis County Public Works Department has a proposed a bridge construction project on CSAH 84 located 5.0 miles NW of Chisholm and over an unnamed stream. The replacement work is scheduled for construction between July 6 and July 31, 2026. The scope of the project is to remove the existing culverts, construct a single 10-foot precast concrete box culvert, and approximately 450-feet of road work.
Location
1.1 Mi E of Hwy 5 and 0.6 Mi W of CSAH 134 (Dewey Lake Rd)
Traffic Impacts
Utilize posted detour and reference map above. Traveling from the east, head north on CSAH 134 (Dewey Lake Rd) for 2.2 miles. Take a left turn onto UT 8128 (Connors Rd), and another left turn onto Hwy 5 to connect back onto CSAH 84.
About this Project
The St. Louis County Public Works Department has a proposed a bridge construction project on CSAH 84 located 5.0 miles NW of Chisholm and over an unnamed stream. The replacement work is scheduled for construction between July 6 and July 31, 2026. The scope of the project is to remove the existing culverts, construct a single 10-foot precast concrete box culvert, and approximately 450-feet of road work.
Location
1.1 Mi E of Hwy 5 and 0.6 Mi W of CSAH 134 (Dewey Lake Rd)
Traffic Impacts
Utilize posted detour and reference map above. Traveling from the east, head north on CSAH 134 (Dewey Lake Rd) for 2.2 miles. Take a left turn onto UT 8128 (Connors Rd), and another left turn onto Hwy 5 to connect back onto CSAH 84.
Page published: 30 Apr 2026, 08:33 PM
Anticipated Timeline
Project Start Date: July 6, 2026
Hwy 84 (CSAH 84) - Bridge Replacement is currently at this stage
Project End Date: July 31, 2026
this is an upcoming stage for Hwy 84 (CSAH 84) - Bridge Replacement
Construction will occur in July 2026. Construction will typically occur between 6:30 am and 6:30 pm Monday through Friday, and work on Saturdays as needed to complete the project on time. No work will occur on Sundays.
How will I get to my house if I live on this section of roadway?
All driveway entrances shall remain open during construction activities. During construction, a signed detour route will be provided until the project is complete.
How will I know when there will be a disruption in access to my property?
Access disruptions are not anticipated but if required, the Contractor will contact you prior to any disruptions to access to your property.