CSAH 133 (Hwy 133) - Culvert Replacement

Share CSAH 133 (Hwy 133) - Culvert Replacement on Facebook Share CSAH 133 (Hwy 133) - Culvert Replacement on Twitter Share CSAH 133 (Hwy 133) - Culvert Replacement on Linkedin Email CSAH 133 (Hwy 133) - Culvert Replacement link

About this Project

The St. Louis County Public Works Department has a proposed a culvert replacement project on CSAH 133 located 3.5 miles west of Meadowlands and spanning over County Judicial Ditch. The replacement work is scheduled for construction between May 18 and August 7, 2026, but anticipated only needing 1-week upon Contractor start. The scope of the project is to salvage the existing culvert, reset the culvert at new ditch grade, and approximately 150-feet of road work.


Location

0.01 Mi E of CR 196 (Creek Rd) and 0.6 Mi W of Hwy 5

Map showing culvert replacement location along Hwy 5 near St. Louis River.


Traffic Impacts

Please utilize the one-lane bypass road for through traffic during construction. Minor delays are expected.



About this Project

The St. Louis County Public Works Department has a proposed a culvert replacement project on CSAH 133 located 3.5 miles west of Meadowlands and spanning over County Judicial Ditch. The replacement work is scheduled for construction between May 18 and August 7, 2026, but anticipated only needing 1-week upon Contractor start. The scope of the project is to salvage the existing culvert, reset the culvert at new ditch grade, and approximately 150-feet of road work.


Location

0.01 Mi E of CR 196 (Creek Rd) and 0.6 Mi W of Hwy 5

Map showing culvert replacement location along Hwy 5 near St. Louis River.


Traffic Impacts

Please utilize the one-lane bypass road for through traffic during construction. Minor delays are expected.



Page published: 07 May 2026, 03:55 PM