W Pike Rd (UT 8201) - Reclaim & Overlay

Share W Pike Rd (UT 8201) - Reclaim & Overlay on Facebook Share W Pike Rd (UT 8201) - Reclaim & Overlay on X (formerly Twitter) Share W Pike Rd (UT 8201) - Reclaim & Overlay on Linkedin Email W Pike Rd (UT 8201) - Reclaim & Overlay link

About this Project

The St. Louis County Public Works Department has a proposed project on UT 8201 from CSAH 21 to CR 715 scheduled for construction between September 28 and end of October of this year. The scope of the project is to reclaim, grade and place new bituminous pavement and realign intersection at CSAH 21.


Location

CSAH 21 to CR 715


Traffic Impacts

Please use posted detour using CR 715.


Mailboxes

Picture of a Mailbox in front of a house with the flag up

As part of St. Louis County’s safety policy, new mailbox supports & mailboxes meeting the Federal crash guidelines will be installed by the Contractor. The new mailbox will be installed in approximately the same location as your existing mailbox. The old supports & mailboxes will be deposited next to your driveway for possible salvage by the owners. About 2 weeks after installation of the new supports & mailboxes, any supports & mailboxes not salvaged by the property owner will be picked up for disposal.


About this Project

The St. Louis County Public Works Department has a proposed project on UT 8201 from CSAH 21 to CR 715 scheduled for construction between September 28 and end of October of this year. The scope of the project is to reclaim, grade and place new bituminous pavement and realign intersection at CSAH 21.


Location

CSAH 21 to CR 715


Traffic Impacts

Please use posted detour using CR 715.


Mailboxes

Picture of a Mailbox in front of a house with the flag up

As part of St. Louis County’s safety policy, new mailbox supports & mailboxes meeting the Federal crash guidelines will be installed by the Contractor. The new mailbox will be installed in approximately the same location as your existing mailbox. The old supports & mailboxes will be deposited next to your driveway for possible salvage by the owners. About 2 weeks after installation of the new supports & mailboxes, any supports & mailboxes not salvaged by the property owner will be picked up for disposal.


Page published: 22 Sep 2026, 12:10 PM