Share Pike River Dr (UT 8214) - Reclaim & Overlay on FacebookShare Pike River Dr (UT 8214) - Reclaim & Overlay on X (formerly Twitter)Share Pike River Dr (UT 8214) - Reclaim & Overlay on LinkedinEmail Pike River Dr (UT 8214) - Reclaim & Overlay link
About this Project
The St. Louis County Public Works Department has a proposed project on UT 8214 (Pike River Dr) from 1.5 miles South of UT 8201 (W Pike Dr) to UT 8201 (W Pike Dr) scheduled for construction between September 28 and end of October of this year. The scope of the project is to reclaim, grade and place new bituminous pavement.
Location
1.5 miles South of UT 8201 (W Pike Dr) to UT 8201 (W Pike Dr)
Traffic Impacts
There will be no detour and all work will be completed under traffic.
Mailboxes
As part of St. Louis County’s safety policy, new mailbox supports & mailboxes meeting the Federal crash guidelines will be installed by the Contractor. The new mailbox will be installed in approximately the same location as your existing mailbox. The old supports & mailboxes will be deposited next to your driveway for possible salvage by the owners. About 2 weeks after installation of the new supports & mailboxes, any supports & mailboxes not salvaged by the property owner will be picked up for disposal.
About this Project
The St. Louis County Public Works Department has a proposed project on UT 8214 (Pike River Dr) from 1.5 miles South of UT 8201 (W Pike Dr) to UT 8201 (W Pike Dr) scheduled for construction between September 28 and end of October of this year. The scope of the project is to reclaim, grade and place new bituminous pavement.
Location
1.5 miles South of UT 8201 (W Pike Dr) to UT 8201 (W Pike Dr)
Traffic Impacts
There will be no detour and all work will be completed under traffic.
Mailboxes
As part of St. Louis County’s safety policy, new mailbox supports & mailboxes meeting the Federal crash guidelines will be installed by the Contractor. The new mailbox will be installed in approximately the same location as your existing mailbox. The old supports & mailboxes will be deposited next to your driveway for possible salvage by the owners. About 2 weeks after installation of the new supports & mailboxes, any supports & mailboxes not salvaged by the property owner will be picked up for disposal.
Page published: 22 Sep 2026, 12:12 PM
Project Start Date: September 28, 2026
Pike River Dr (UT 8214) - Reclaim & Overlay is currently at this stage
Project End Date: October, 2026
this is an upcoming stage for Pike River Dr (UT 8214) - Reclaim & Overlay