About the Study

St. Louis County is leading a corridor study of CSAH 100 (3rd Ave N/Main St), beginning at a point 0.22 mile east of MNTH 135 and ending at CSAH 110 (Hwy 110), for a total length of 1.83 miles in the City of Aurora. The outcome of this study will be the preferred corridor layout which will be used for the planned reconstruction project on this corridor in 2026.

Share About the Study on Facebook Share About the Study on Twitter Share About the Study on Linkedin Email About the Study link
<span class="translation_missing" title="translation missing: en-US.projects.blog_posts.show.load_comment_text">Load Comment Text</span>