Share Lindelof Rd (Twp 5766) - Bridge Replacement on FacebookShare Lindelof Rd (Twp 5766) - Bridge Replacement on TwitterShare Lindelof Rd (Twp 5766) - Bridge Replacement on LinkedinEmail Lindelof Rd (Twp 5766) - Bridge Replacement link
About this Project
The St. Louis County Public Works Department has scheduled the replacement of Bridge 190 and to occur in the summer months of 2024. The bridge is located on Twp 5766 (Lindelof Rd), over Hellwig Creek, and 7.6 miles south of Cotton, MN. The scope of the project is full replacement of Bridge 190, construction of new Bridge 190 to consist of a single 12-foot-wide box culvert, and approach grading. During construction a bypass road will be constructed to allow uninterrupted access.
Location
On Lindelof Rd between 0.2 Mi W of Jct CSAH 25 and 1.2 Mi E of Jct CR 453 (White Rd)
Traffic Impacts
During construction a bypass road will be constructed to allow uninterrupted access.
About this Project
The St. Louis County Public Works Department has scheduled the replacement of Bridge 190 and to occur in the summer months of 2024. The bridge is located on Twp 5766 (Lindelof Rd), over Hellwig Creek, and 7.6 miles south of Cotton, MN. The scope of the project is full replacement of Bridge 190, construction of new Bridge 190 to consist of a single 12-foot-wide box culvert, and approach grading. During construction a bypass road will be constructed to allow uninterrupted access.
Location
On Lindelof Rd between 0.2 Mi W of Jct CSAH 25 and 1.2 Mi E of Jct CR 453 (White Rd)
Traffic Impacts
During construction a bypass road will be constructed to allow uninterrupted access.
Page last updated: 01 May 2024, 09:43 AM
Anticipated Timeline
Project Start Date: Sept 2, 2024
Lindelof Rd (Twp 5766) - Bridge Replacement is currently at this stage
Project End Date: Oct 31, 2024