About this Project
The St. Louis County Public Works Department has a proposed project on CSAH 6 (Maple Grove Road) from TH 33 to TH 2 scheduled for construction in 2025 or 2026. The scope of the project is to add new pavement and improve sight distance and drainage.
Location
Maple Grove Road from TH 33 to TH 2
Traffic Impacts
To be determined closer to the project start.
Property Access Details
This project will be performed with a road closure. Houses with no access to a side street will access their homes either by driving through the construction site, or walking on a marked path to their home when road access is not feasible. We will try and keep the amount of time that walking is required to a minimum. Persons with disabilities should contact Steve Krasaway to discuss special accommodations.
During the placement of curb and gutter, concrete sidewalk, and concrete driveways, vehicular access to your property will be limited. The Contractor will contact you prior to any disruptions to access to your property to discuss the details on where to park.
If you would like to have any additional work performed on your driveway, yard, or sidewalk, please contact the Contractor directly.
Mailboxes
As part of St. Louis County’s safety policy, new mailbox supports & mailboxes meeting the Federal crash guidelines will be installed by the Contractor. The new mailbox will be installed in approximately the same location as your existing mailbox. The old supports & mailboxes will be deposited next to your driveway for possible salvage by the owners. About 2 weeks after installation of the new supports & mailboxes, any supports & mailboxes not salvaged by the property owner will be picked up for disposal.
Stay Informed
Sign up for email updates
About this Project
The St. Louis County Public Works Department has a proposed project on CSAH 6 (Maple Grove Road) from TH 33 to TH 2 scheduled for construction in 2025 or 2026. The scope of the project is to add new pavement and improve sight distance and drainage.
Location
Maple Grove Road from TH 33 to TH 2
Traffic Impacts
To be determined closer to the project start.
Property Access Details
This project will be performed with a road closure. Houses with no access to a side street will access their homes either by driving through the construction site, or walking on a marked path to their home when road access is not feasible. We will try and keep the amount of time that walking is required to a minimum. Persons with disabilities should contact Steve Krasaway to discuss special accommodations.
During the placement of curb and gutter, concrete sidewalk, and concrete driveways, vehicular access to your property will be limited. The Contractor will contact you prior to any disruptions to access to your property to discuss the details on where to park.
If you would like to have any additional work performed on your driveway, yard, or sidewalk, please contact the Contractor directly.
Mailboxes
As part of St. Louis County’s safety policy, new mailbox supports & mailboxes meeting the Federal crash guidelines will be installed by the Contractor. The new mailbox will be installed in approximately the same location as your existing mailbox. The old supports & mailboxes will be deposited next to your driveway for possible salvage by the owners. About 2 weeks after installation of the new supports & mailboxes, any supports & mailboxes not salvaged by the property owner will be picked up for disposal.
How will I get to my house if I live on this section of roadway?
Houses with no access to a side street will access their homes either by driving through the construction site, or walking on a marked path to their home when road access is not feasible. We will try and keep the amount of time that walking is required to a minimum. Persons with disabilities should contact Steve Krasaway to discuss special accommodations.
Who do I contact if I would like additional work performed on my driveway, yard, or sidewalk?
Please contact the Contractor directly for any additional work you would like performed on your driveway, yard, or sidewalk.