Project Complete
About this Project
The St. Louis County Public Works Department has scheduled the replacement of failed pipe culverts, to occur in the summer months of 2024. The existing pipe culverts is located on Twp 5642 (Beckman Rd), over the Sullivan Creek, and 3.8 miles north of Twig, MN. The scope of the project is full replacement of (2) pipe culverts, construction of new Bridge 177 to consist of a single 16-foot-wide box culvert, and approach grading. A bypass road will be constructed with the project to have uninterrupted access.
Location
0.5 Mi E of Jct CSAH 15 and 0.2 Mi N on Twp 5642 (Beckman Rd)
Traffic Impacts
During construction a bypass road will be constructed to allow uninterrupted access.
Project Complete
About this Project
The St. Louis County Public Works Department has scheduled the replacement of failed pipe culverts, to occur in the summer months of 2024. The existing pipe culverts is located on Twp 5642 (Beckman Rd), over the Sullivan Creek, and 3.8 miles north of Twig, MN. The scope of the project is full replacement of (2) pipe culverts, construction of new Bridge 177 to consist of a single 16-foot-wide box culvert, and approach grading. A bypass road will be constructed with the project to have uninterrupted access.
Location
0.5 Mi E of Jct CSAH 15 and 0.2 Mi N on Twp 5642 (Beckman Rd)
Traffic Impacts
During construction a bypass road will be constructed to allow uninterrupted access.