Project Complete!

About this Project

The St. Louis County Public Works Department has scheduled the replacement of Bridge 674 and to occur in the summer months of 2024. The bridge is located on CR 958 (Three Bridges Rd), over the Rice River, and 3.8 miles SW of Cook, MN. The scope of the project is full replacement of Bridge 674, construction of new Bridge 674, and approach grading. A detour route will be utilized and signed for the duration of construction.


Location

On Three Bridges Rd between 0.1 Mi E of Jct Twp 7978 (Neva Rd) and 1.0 Mi W of Jct CR 914 (Watt Rd)


Traffic Impacts

Follow posted detour route (see map above).

Project Complete!

About this Project

The St. Louis County Public Works Department has scheduled the replacement of Bridge 674 and to occur in the summer months of 2024. The bridge is located on CR 958 (Three Bridges Rd), over the Rice River, and 3.8 miles SW of Cook, MN. The scope of the project is full replacement of Bridge 674, construction of new Bridge 674, and approach grading. A detour route will be utilized and signed for the duration of construction.


Location

On Three Bridges Rd between 0.1 Mi E of Jct Twp 7978 (Neva Rd) and 1.0 Mi W of Jct CR 914 (Watt Rd)


Traffic Impacts

Follow posted detour route (see map above).

  • Progress Pictures

    Share Progress Pictures on Facebook Share Progress Pictures on Twitter Share Progress Pictures on Linkedin Email Progress Pictures link

    8/20/2024

Page last updated: 05 Nov 2024, 01:33 PM