W Savanna Rd (CR 187) - Bridge Replacement

Share W Savanna Rd (CR 187) - Bridge Replacement on Facebook Share W Savanna Rd (CR 187) - Bridge Replacement on Twitter Share W Savanna Rd (CR 187) - Bridge Replacement on Linkedin Email W Savanna Rd (CR 187) - Bridge Replacement link

This is Complete!

About this Project

The St. Louis County Public Works Department has scheduled the replacement of Bridge 204 to occur in the summer months of 2024. The bridge is located on CR 187 (W Savanna Rd), over an unnamed stream, and 12.1 miles north of Floodwood, MN. The scope of the project is full replacement of Bridge 204, construction of new Bridge 204 to be a single precast concrete box culvert, and approach grading. CR 187 shall be closed and detoured for the duration of construction.


Location

1.3 Mi E of TH-73, 0.7 Mi W of CR 186 (Savanna Rd N)


Traffic Impacts

Follow posted detour route.

This is Complete!

About this Project

The St. Louis County Public Works Department has scheduled the replacement of Bridge 204 to occur in the summer months of 2024. The bridge is located on CR 187 (W Savanna Rd), over an unnamed stream, and 12.1 miles north of Floodwood, MN. The scope of the project is full replacement of Bridge 204, construction of new Bridge 204 to be a single precast concrete box culvert, and approach grading. CR 187 shall be closed and detoured for the duration of construction.


Location

1.3 Mi E of TH-73, 0.7 Mi W of CR 186 (Savanna Rd N)


Traffic Impacts

Follow posted detour route.

  • Bridge Updates!

    Share Bridge Updates! on Facebook Share Bridge Updates! on Twitter Share Bridge Updates! on Linkedin Email Bridge Updates! link

    7/11/2024

    7/15/2024

Page last updated: 17 Jul 2024, 02:49 PM