Survey
Thank you for taking time to complete this survey for the Midway Road Corridor Study. Your responses are anonymous and will help the project team understand the community’s perspective on current issues and potential improvements as well as develop a vision for this corridor. This survey is expected to take less than 10 minutes.
The purpose of the Midway Road Corridor Study is to develop recommended roadway and intersection designs that will be implemented in future reconstruction projects.
The study includes two roadway segments: Midway Road (CSAH 9/13) from MNTH 194 to North Pike Lake Road (CSAH 9), and Martin Road (CSAH 9) from Midway Road (CSAH 13) to Vaux Road. This corridor study will also evaluate the intersections of US 53 at Midway Road (CSAH 13) and Midway Road (CSAH 13) at Martin Road (CSAH 9).
The project team will develop design alternatives for the study area that are based on known issues and the corridor vision. These design alternatives will be presented to the public for their feedback in late summer/early fall 2025. The project team will finalize the recommended design after receiving feedback and completing the traffic engineering analysis. A final meeting will be held to inform the public on the final recommended design in late fall/early winter 2025.
0% answered