Overview
The 40th Ave West Corridor Project begins at the Interstate 35 interchange and ends at the railroad crossing located near 9th St for a total distance of 0.8 mile. Both St. Louis County and the City of Duluth own and maintain respective segments of 40th Ave West.
The county segment of 40th Ave West begins at Grand Ave and ends at the railroad crossing located near 9th St. The road name changes at the railroad crossing to Haines Rd. The county road number designation is CSAH 91. The city segment of 40th Ave West begins at the Interstate 35 interchange and ends at Grand Ave. The city road number designation is MSAS 110.
St. Louis County is planning a reconstruction project of the county segment of 40th Ave West in 2026. In preparation for this project, St. Louis County is leading a study to identify improvements that will be included in the future reconstruction project. To ensure continuity along the corridor, the City of Duluth is participating in this study to also identify improvements on the city segment of 40th Ave West. The City of Duluth does not have a construction project currently programmed for 40th Ave West. When funding becomes available, the City of Duluth would then complete the improvements identified in this study.
Study Focus Areas
The focus of this study includes the following:
Driving lane configuration
Intersections, including a focus on the intersections at Grand Ave and the Interstate 35 interchange
The railroad crossing
On-street parking
Accommodations for pedestrians and bicyclists
Access management
Landscape
Study Input
The study will invite input from three stakeholder groups:
General Public
Local agencies (includes representation from administration, engineering, maintenance, planning, law enforcement and emergency response)
St. Louis County
City of Duluth
Minnesota Department of Transportation (MnDOT)
Duluth Schools (ISD 709)
Duluth Transit Authority
Duluth-Superior Metropolitan Interstate Council (MIC)
The MIC's Bicycle-Pedestrian Advisory Committee (BPAC)
Local businesses
Study Results
The 40th Ave Corridor study is now complete. The County section of the project will be constructed in 2026. See below for the project layouts or to see them larger, download the pdf version in the documents section.
County Section:
County 40th Ave W/Grand Ave Intersection:
City of Duluth Section:
Overview
The 40th Ave West Corridor Project begins at the Interstate 35 interchange and ends at the railroad crossing located near 9th St for a total distance of 0.8 mile. Both St. Louis County and the City of Duluth own and maintain respective segments of 40th Ave West.
The county segment of 40th Ave West begins at Grand Ave and ends at the railroad crossing located near 9th St. The road name changes at the railroad crossing to Haines Rd. The county road number designation is CSAH 91. The city segment of 40th Ave West begins at the Interstate 35 interchange and ends at Grand Ave. The city road number designation is MSAS 110.
St. Louis County is planning a reconstruction project of the county segment of 40th Ave West in 2026. In preparation for this project, St. Louis County is leading a study to identify improvements that will be included in the future reconstruction project. To ensure continuity along the corridor, the City of Duluth is participating in this study to also identify improvements on the city segment of 40th Ave West. The City of Duluth does not have a construction project currently programmed for 40th Ave West. When funding becomes available, the City of Duluth would then complete the improvements identified in this study.
Study Focus Areas
The focus of this study includes the following:
Driving lane configuration
Intersections, including a focus on the intersections at Grand Ave and the Interstate 35 interchange
The railroad crossing
On-street parking
Accommodations for pedestrians and bicyclists
Access management
Landscape
Study Input
The study will invite input from three stakeholder groups:
General Public
Local agencies (includes representation from administration, engineering, maintenance, planning, law enforcement and emergency response)
St. Louis County
City of Duluth
Minnesota Department of Transportation (MnDOT)
Duluth Schools (ISD 709)
Duluth Transit Authority
Duluth-Superior Metropolitan Interstate Council (MIC)
The MIC's Bicycle-Pedestrian Advisory Committee (BPAC)
Local businesses
Study Results
The 40th Ave Corridor study is now complete. The County section of the project will be constructed in 2026. See below for the project layouts or to see them larger, download the pdf version in the documents section.
The Survey has been CLOSED. Thank you to those who participated!
Thank you for your time to complete this survey for the 40th Ave W Corridor Study. Your input is very valuable. This survey is expected to take less than 10 minutes.
Yes, your input matters. Without active participation by the local community, the 40th Ave W Corridor of the future may not reflect the values of the local community.