CSAH 48 (Taft Road / Fish Lake Road) - Reclaim & Overlay

Share CSAH 48 (Taft Road / Fish Lake Road) - Reclaim & Overlay on Facebook Share CSAH 48 (Taft Road / Fish Lake Road) - Reclaim & Overlay on Twitter Share CSAH 48 (Taft Road / Fish Lake Road) - Reclaim & Overlay on Linkedin Email CSAH 48 (Taft Road / Fish Lake Road) - Reclaim & Overlay link

About this Project

The St. Louis County Public Works Department has a proposed project on CR 533 (Old Taft Road) between CSAH 48 (Taft Road) and the end of the existing pavement. The scope of the project includes a full depth reclamation of the existing pavement and the construction of new full depth asphalt pavement.


Project Location

Between Lavaque Road and the Cloquet River

Related Projects in the Area:


Traffic Impacts

There will be no detour and all work will be completed under traffic.


Property Access Details

CSAH 48 (Taft Road / Fish Lake Road) will be open to both through and local traffic throughout the project. The Contractor will utilize flagmen during work hours to allow traffic to safely pass through the project. Expect delays in traveling through the project, especially when the Contractor is working in front of your property.

If you would like to have any additional work performed on your driveway, yard, or sidewalk, please contact the Contractor directly.


Mailboxes

As part of St. Louis County’s safety policy, new mailbox supports & mailboxes meeting the Federal crash guidelines will be installed by the Contractor. The new mailbox will be installed in approximately the same location as your existing mailbox. The old supports & mailboxes will be deposited next to your driveway for possible salvage by the owners. About 2 weeks after installation of the new supports & mailboxes, any supports & mailboxes not salvaged by the property owner will be picked up for disposal.



About this Project

The St. Louis County Public Works Department has a proposed project on CR 533 (Old Taft Road) between CSAH 48 (Taft Road) and the end of the existing pavement. The scope of the project includes a full depth reclamation of the existing pavement and the construction of new full depth asphalt pavement.


Project Location

Between Lavaque Road and the Cloquet River

Related Projects in the Area:


Traffic Impacts

There will be no detour and all work will be completed under traffic.


Property Access Details

CSAH 48 (Taft Road / Fish Lake Road) will be open to both through and local traffic throughout the project. The Contractor will utilize flagmen during work hours to allow traffic to safely pass through the project. Expect delays in traveling through the project, especially when the Contractor is working in front of your property.

If you would like to have any additional work performed on your driveway, yard, or sidewalk, please contact the Contractor directly.


Mailboxes

As part of St. Louis County’s safety policy, new mailbox supports & mailboxes meeting the Federal crash guidelines will be installed by the Contractor. The new mailbox will be installed in approximately the same location as your existing mailbox. The old supports & mailboxes will be deposited next to your driveway for possible salvage by the owners. About 2 weeks after installation of the new supports & mailboxes, any supports & mailboxes not salvaged by the property owner will be picked up for disposal.



Page last updated: 29 Apr 2025, 10:19 AM