About this Project
The St. Louis County Public Works Department has a proposed culvert replacement project on CR 844 (Nygaard Road) located 0.55 miles north of TH 2 scheduled for construction between June 23 and August 2. The duration of construction will be approximately one week during the dates listed above.
Project Location
Nygaard Rd (CR 844)
Related Projects in the Area:
Traffic Impacts
A road closure will be permitted on CR 844. If the Contractor elects to implement a road closure, signs shall be placed on CR 844 at US 2 and McCamus Road with the date and location of the proposed closure along with signs at the road closure location indicating the location of the closure facing both directions one week prior to the road closure.
About this Project
The St. Louis County Public Works Department has a proposed culvert replacement project on CR 844 (Nygaard Road) located 0.55 miles north of TH 2 scheduled for construction between June 23 and August 2. The duration of construction will be approximately one week during the dates listed above.
Project Location
Nygaard Rd (CR 844)
Related Projects in the Area:
Traffic Impacts
A road closure will be permitted on CR 844. If the Contractor elects to implement a road closure, signs shall be placed on CR 844 at US 2 and McCamus Road with the date and location of the proposed closure along with signs at the road closure location indicating the location of the closure facing both directions one week prior to the road closure.
Page last updated: 02 May 2025, 04:09 PM
Anticipated Timeline
Project Start Date: June 23, 2025
Nygaard Rd (CR 844) - Culvert Replacement is currently at this stage
Project End Date: August 2, 2025
this is an upcoming stage for Nygaard Rd (CR 844) - Culvert Replacement
Construction will occur for a 1 week period sometime between June 23 and August 2. Construction will be occurring between 7:00 am and 7:00 pm Monday through Friday, and between 7:00 am and 5:00 pm on Saturdays. No work will occur on Sundays.
How will I get to my house if I live on this section of roadway?
You will always have access to your property. The direction of how you access it may change or expect delays.