CSAH 100 Corridor Study

Share CSAH 100 Corridor Study on Facebook Share CSAH 100 Corridor Study on Twitter Share CSAH 100 Corridor Study on Linkedin Email CSAH 100 Corridor Study link

St. Louis County is leading a corridor study of CSAH 100 (3rd Ave N/Main St), beginning at a point 0.22 mile east of MNTH 135 and ending at CSAH 110 (Hwy 110), for a total length of 1.83 miles in the City of Aurora. Part of this study is proposing construction of one grade separated bridge at CSAH 100 railroad crossing in Aurora, MN which would eliminate the railroad crossing. The County is applying for a grant for this. Check out the website here: CSAH 100 Railroad Crossing Elimination Grant | Input Central. The outcome of this study will be the preferred corridor layout which will be used for the planned reconstruction project on this corridor in 2026. This study is anticipated to be completed by this December 2024.

The key focus areas of the corridor study include…

  1. Complete an intersection control evaluation (ICE) of Main St and 3rd Ave N. The ICE will recommend a long-term intersection control strategy.
  2. Develop a typical section(s) for the CSAH 100 corridor.
  3. Develop a 2D (aerial view) layout for the CSAH 100 corridor.

Preliminary Layout

To see a larger version, Click Here


Get Involved

Share your insights, experiences, and questions as we look to develop a community-supported vision before we develop a project.

  • Attend public meetings (in-person or virtually)
  • Complete the online survey (CLOSED)
  • Complete the online comment map (CLOSED)

Stay Informed

  • Sign up for email updates

St. Louis County is leading a corridor study of CSAH 100 (3rd Ave N/Main St), beginning at a point 0.22 mile east of MNTH 135 and ending at CSAH 110 (Hwy 110), for a total length of 1.83 miles in the City of Aurora. Part of this study is proposing construction of one grade separated bridge at CSAH 100 railroad crossing in Aurora, MN which would eliminate the railroad crossing. The County is applying for a grant for this. Check out the website here: CSAH 100 Railroad Crossing Elimination Grant | Input Central. The outcome of this study will be the preferred corridor layout which will be used for the planned reconstruction project on this corridor in 2026. This study is anticipated to be completed by this December 2024.

The key focus areas of the corridor study include…

  1. Complete an intersection control evaluation (ICE) of Main St and 3rd Ave N. The ICE will recommend a long-term intersection control strategy.
  2. Develop a typical section(s) for the CSAH 100 corridor.
  3. Develop a 2D (aerial view) layout for the CSAH 100 corridor.

Preliminary Layout

To see a larger version, Click Here


Get Involved

Share your insights, experiences, and questions as we look to develop a community-supported vision before we develop a project.

  • Attend public meetings (in-person or virtually)
  • Complete the online survey (CLOSED)
  • Complete the online comment map (CLOSED)

Stay Informed

  • Sign up for email updates
  • Public Meeting #3

    Share Public Meeting #3 on Facebook Share Public Meeting #3 on Twitter Share Public Meeting #3 on Linkedin Email Public Meeting #3 link
    supporting image

    Date/Time: Thursday, November 21, 2024 at 6 PM

    Meeting Location: Aurora Community Center - 15 W 1st Ave N, Aurora, MN

    Meeting Recording Link: https://youtu.be/Ag0Uo5jnVQA

  • Public Meeting #2

    Share Public Meeting #2 on Facebook Share Public Meeting #2 on Twitter Share Public Meeting #2 on Linkedin Email Public Meeting #2 link

    Date/Time: Tuesday, July 9, 2024 at 6 PM

    Meeting Location: Aurora Community Center - 15 W 1st Ave N, Aurora, MN

    Meeting Recording Link: Public Meeting #2 Recording


  • Public Meeting #1

    Share Public Meeting #1 on Facebook Share Public Meeting #1 on Twitter Share Public Meeting #1 on Linkedin Email Public Meeting #1 link
    supporting image

    Thank you for all who attended the 1st Public Meeting! This kick-off meeting for the project was held to obtain input about concerns, issues, and future vision.

    Meeting Recording Link: CSAH 100 Corridor Project 1st Public Meeting (youtube.com)

    Date/Time: Tuesday, March 19, 2024 at 6 PM

    Meeting Location: Aurora Community Center - 15 W 1st Ave N, Aurora, MN

    Virtual Meeting Link: https://bit.ly/CSAH100MeetingLink

  • About the Study

    Share About the Study on Facebook Share About the Study on Twitter Share About the Study on Linkedin Email About the Study link

    St. Louis County is leading a corridor study of CSAH 100 (3rd Ave N/Main St), beginning at a point 0.22 mile east of MNTH 135 and ending at CSAH 110 (Hwy 110), for a total length of 1.83 miles in the City of Aurora. The outcome of this study will be the preferred corridor layout which will be used for the planned reconstruction project on this corridor in 2026.

Page last updated: 22 Nov 2024, 02:35 PM